51³Ô¹Ï

Bonjou! Byenvini sou b¨° konpayi EMAR
Fokuse sou CNC machining pati, metal en pati, Et sheet metal prot¨¦nsion Et prot¨¦nsion pou plis 16 an
Aleman ak Japon a anwo nan sy¨¨l la pwodwi presyon Et ekipman t¨¨s asire ke pr¨¦cisisyon de pati metal atire 0.003 ent¨¨rans ak wo kalite anwo nan sy¨¨l la
bwat postal£º
Shielding cover sheet metal processing and production
Lokasyon ou: home > ²Ô´Ç³Ü±¹¨¨±ô > Dinamik Industri > Shielding cover sheet metal processing and production

Shielding cover sheet metal processing and production

Relikasyon an tan£º2024-05-12     Number of views :


Taking Shenzhen Lida Precision Factory as an example, our production process generally consists of 16 steps, as shown in the following figure.

Shielding cover sheet metal processing and production(pic1)

Fokus pwensipal nou nan travay se:

1 ? Plan pwodwi: Departman pou tout sikilasyon an ap prompt konfirme istwa envans¨¨ de matery¨¨l r¨°ch, pwodwi fini, etc. nan fabriki a apre resevwa l¨°d a; Si desen teknik ak list ¨¦ matery¨¨l yo nan plas; Whether the materials can be timely, timely, and in place on time; Arrange plan pwodwi a e pri yon kopi de instruksyon pwodwi a pou yo voye pou department pwodwi a.

Shielding cover sheet metal processing and production(pic2)

2, insp¨¨ksyon en: pou asire kalite a nan sous la, li neses¨¨ pou pran yon echantiyon de Sur 1 m¨¨t de chak roll de matery¨¨l raw pou insp¨¨ksyon sa a. Pa visualement insp¨¨kte Et verifye echantiyon an, matery¨¨l la kontrole pou konsantrasyon, ak sifas matery¨¨l la kontrole pou oxidation, doul¨¨, ak l¨°t Aparans defects. itilize yon micrometer pou verifye si byen pw¨¨s Et espesyalman de matery¨¨l ranpli estanda yo; Chak w¨°l sont echantiyon Et subjected pou renf¨°se soldering pou t¨¨s matery¨¨l a konsistency tanperati wo (si gen okenn defects tankou deformation, koul¨¨ diferans, oxidation, etc. sou sifas apre conductance t¨¨s tanperati wo)

Shielding cover sheet metal processing and production(pic3)

3.Apre resevwa f¨°m pou enf¨°masyon pwodwi a, depatman pwodwi pwodwi yo pwodwi: matery¨¨l yo kole segond¨¨ requirement f¨°m pou enf¨°masyon pou yo; Transfer matery¨¨l la nan en a, pa gen Et koupe li nan plizy¨¨ presyon, lak¨°z matery¨¨l pou deform nan a espesyal direksyon dezy¨¨ a nan mold, Et s' travay par¨¨t a. Premye peche l¨°d dwe insp¨¨kte Et a jite apre tout bagay insp¨¨ksyon nan liv insp¨¨ksyon an, ak premye peche lan dwe siye Et konfime anvan k¨°manse pwodwi a. During the production process, it is necessary to wear finger cots when starting the machine and conduct regular self checks. If any defects are found, the machine should be immediately shut down for improvement.

Shielding cover sheet metal processing and production(pic4)

4, dlo lans¨¨: omwen de pwosesis netwaye. pran travay nan z¨°n la pou ¨ºtre netwayaj Et chare l' nan yon konten¨¨ mesh. L¨¨ sa a, mete l' nan yon ultrasonic wave Et netwayaj l' ak kab¨°n ak Idwoj¨¨n pou 10 minit pou netwayaj lavil la stains de travay an. Apre retire, mete l' nan yon sekond¨¨ hydrocarbon netwayaj tank Et netwayaj l' ank¨° pou 5 minit pou retire tout r¨¨s koul¨¨ sou sifas la. After taking it out again, place the workpiece in the cleaning tank for 3-5 minutes and filter out the hydrocarbons. Pandan pwos¨¨ netwaye an, remplase agent netwaye regularmen chak 3 ¨¨ pou asire ef¨¨ netwaye an. L¨¨ sa a, li spreye par¨¨t travay a epi mete l' sou l¨¨ a ekipman k'ap damye pou apepw¨¨ 10 minit pou p¨¨m¨¨t l' pou l¨¨ a mouri n¨¨t. Apre sa, mete kote a travay nan bwat transf¨¨ a.

Shielding cover sheet metal processing and production(pic5)

5, Paching: Va f¨¨ dw¨¨t kouvri atrav¨¨ pwos¨¨ pak¨¨t yo epi remplase yo nan yon fason ki timely pou evite kontak dir¨¨k ant po a ak kote travay sou yo, epi prevenite mak dw¨¨t, twal, Et p¨°v oxidation. Moun travay yo nan z¨°n ki pak¨¨t yo ap insp¨¨kte au apre instruksyon insp¨¨ksyon an, epi yo ka s¨¨lman mete nan pak¨¨t apre sa te konfirme pou ¨ºtre bon epi bay enf¨°masyon. mete kote travay ki pake sou tab la ki pake epi mete l' nan ti kraj la nan menm direksyon an. anvan mete l, t¨¨t ou verifye si gen okenn evidan defects sou sifas lavil la. Apre sa ki konfime accuracy a, pak¨¨t a afiche etik¨¨t la anndan bwat Et ferme bwat la pou shipment.

6¡¢ Confirmation before shipment: The clerk shall affix the shipping label, and QA shall confirm whether the material code on the shipping label is correct, whether it matches the actual product, and whether the quantity is correct. After confirmation, the shipping label must be stamped for confirmation before shipment can be made. If there are any abnormalities, timely rejection and problem feedback shall be made, and modifications and rework shall be made.

Emma Technology Co., Ltd. se youn nan pwofesyon¨¨l ki te mennen pwofesyon¨¨l sou pati pr¨¦cizisyon metal nan Chini, te etabli an 2006. Li principement empresyon biznis tankou CNC Machining pati, w¨°ch met¨¡l, ak w¨°ch met¨¡l pwogramasyon.