51吃瓜

Hello! Welcome to EMAR company website!
Focused on 51吃瓜, metal stamping parts, and sheet metal processing and manufacturing for over 16 years
Germany and Japan's high-precision production and testing equipment ensure that the precision of metal parts reaches 0.003 tolerance and high quality
尘补颈濒产辞虫:
Analyze the specific operation steps of hardware processing in Shenzhen Machinery Processing Plant
Your location: home > News > Industry dynamics > Analyze the specific operation steps of hardware processing in Shenzhen Machinery Processing Plant

Analyze the specific operation steps of hardware processing in Shenzhen Machinery Processing Plant

Release time:2025-01-20     Number of views :


Shenzhen machinery processing plant hardware processing operation steps:

First, before entering the job, all employees should check whether their clothing meets the work requirements. Slippers, high heels and clothing that affect safety are not allowed, and hard hats should be worn for those with long hair. Maintain the correct posture when working, and have sufficient spirit to cope with the work. If you find any physical discomfort, you should leave the job immediately and report to the leader. When operating, you must be focused, strictly prohibited from chatting, and cooperate with each other. Operators should not operate in a state of irritability and fatigue to avoid accidents and ensure safe operation.

Before working, check whether the moving part of the hardware processing machinery in Shenzhen is filled with lubricating oil, then start and check whether the clutch and brake are normal, and turn the machine by air for 1-3 minutes. It is strictly forbidden to operate the machine if there is a failure.

Analyze the specific operation steps of hardware processing in Shenzhen Machinery Processing Plant(pic1)Third, when replacing the mold, first turn off the power supply. After the punch motion department stops running, you can start installing and debugging the mold. After the installation and adjustment are completed, move the flywheel by hand to test the punch twice to check whether the upper and lower molds are symmetrical and reasonable, whether the screws are firm, and whether the blank holder ring is in a reasonable position.

Fourth, the hardware processing of Shenzhen Machinery Processing Plant must wait for all other personnel to leave the mechanical work area and remove the debris on the workbench before starting the power supply to start the machine.

Fifth, after the machine is started, one person will transport the material and operate the machine. Others are not allowed to press the power construction or step on the foot switch plate, let alone put their hands into the mechanical working area or touch the moving part of the machine with their hands. When the machine is working, it is forbidden to put your hands into the slider working area, and it is strictly forbidden to take and put the workpiece by hand. When taking and putting the workpiece in the die, you must use tools that meet the standards. If you find that the machine has abnormal sound or the machine fails, you should immediately turn off the power switch for inspection.

Sixth, when the hardware processing plant in Shenzhen is off work, the power supply should be turned off and the finished products, scraps and sundries on the post should be sorted out to ensure a clean and safe working environment.

The above operating procedures must be consciously followed, do not operate in violation of regulations, and in the event of a malfunction, cooperate with maintenance personnel for maintenance. If an accident occurs, immediately cut off the power supply, maintain on-site reporting to the factory, and wait for processing. All consequences of violating the operating procedures shall be borne by the parties.